SPARTAN DELTA HZ PEMBINA 3-2-44-3

Spartan Delta · Duvernay · Horizontal · Savanna 639

UWI 100/03-02-044-03W5/00 SHL 07-15-044-03W5 AFE 25DRI538-O Licence 0518040

2025-06-15
Spud Date
2025-07-01
Rig Release
15.48 d
Days from Spud
16.1 d
Total days
6,854 m
TD
3,814 m
LL
443
m/day
597
$/m
1,072
$/LL
$4.09M
Field cost
105%
% of AFE
same operator · 28 wells
Plan view — surface ● → toe ◆ · departure 3,969 m @ 161°
surfacetoe / TD · 3,969 m departure @ 161°NEWS1,000 m