SPARTAN DELTA HZ GILBY 9-4-41-3

Spartan Delta · Duvernay · Horizontal · Savanna 639

UWI 100/09-04-041-03W5/00 SHL 04-20-041-03W5 AFE 25DRI545-O Licence 0518186

2025-08-21
Spud Date
2025-09-09
Rig Release
19.06 d
Days from Spud
19.6 d
Total days
7,612 m
TD
4,129 m
LL
399
m/day
597
$/m
1,101
$/LL
$4.55M
Field cost
101%
% of AFE
same operator · 28 wells
Plan view — surface ● → toe ◆ · departure 5,204 m @ 144°
surfacetoe / TD · 5,204 m departure @ 144°NEWS2,000 m