SPARTAN DELTA 102 PEMBINA 13-25-43-4

Spartan Delta Ā· Duvernay Ā· Horizontal Ā· Savanna 639

UWI 102/13-25-043-04W5/02 SHL 03-10-044-04W5 AFE 25DRI554-O Licence 0514861

2025-09-22
Spud Date
2025-10-08
Rig Release
16.59 d
Days from Spud
18.4 d
Total days
7,721 m
TD
4,319 m
LL
465
m/day
607
$/m
1,085
$/LL
$4.69M
Field cost
96%
% of AFE
same operator Ā· 28 wells
Plan view — surface ā— → toe ā—† Ā· departure 4,836 m @ 145°
surfacetoe / TD · 4,836 m departure @ 145°NEWS1,000 m