a- 030-H

Canbriam · Montney C5 · Horizontal (Int.) · Savanna 653

UWI 200/C-033-G/094-B-08/00 SHL D-30-H AFE 21DR0016 Licence 37954

2021-06-25
Spud Date
2021-08-15
Rig Release
21.05 d
Days from Spud
23.5 d
Total days
5,421 m
TD
2,885 m
LL
258
m/day
652
$/m
1,226
$/LL
$3.54M
Field cost
94%
% of AFE
same operator · 11 wells
Plan view — surface ● → toe ◆ · departure 3,019 m @ 296°
surfacetoe / TD · 3,019 m departure @ 296°NEWS1,000 m