d-B030-H

Canbriam · Montney C5 · Horizontal (Int.) · Savanna 653

UWI 203/C-043-G/094-B-08/00 SHL D-30-H AFE 21DR0013 Licence 37951

2021-06-27
Spud Date
2021-10-20
Rig Release
18.97 d
Days from Spud
24.5 d
Total days
5,575 m
TD
3,015 m
LL
294
m/day
635
$/m
1,175
$/LL
$3.54M
Field cost
96%
% of AFE
same operator · 11 wells
Plan view — surface ● → toe ◆ · departure 3,284 m @ 304°
surfacetoe / TD · 3,284 m departure @ 304°NEWS1,000 m